 YP Series (Pressure Type) Hydraulic Dynamometer
 Hits:32820 AddTime:2024/2/4 9:27:21

一、Summary

YP series (pressure type) hydraulic dynamometers have been widely used abroad in the 1960s and 1970s. In 1985, through license trade, China introduced the technology of Zoller Company, West Germany, to develop and produce this type of advanced dynamometer. At present, the process technology has been used in the production of a whole series of products in China. Internationally, there are Fraud in England and Cairn Company in the United States. In addition, two domestic companies have produced this series of products in small batches through imitation. Our company digests and absorbs foreign technology, carries out new optimization design and production, and can provide a full range of products.

YP series hydraulic dynamometer has 12 specifications, all of which are controlled by electric drainage butterfly valve. That is, by changing the opening of butterfly valve to change the size of absorption power. The braking power range is from 20KW to 5900KW, and the variety is complete. Domestic and foreign users choose the right type according to their engine power range.
This product is mainly used to test the effective power of various diesel engines, gasoline engines, motors and other power engines. It is an indispensable test equipment in the performance test of power engine and the efficiency test of transmission machinery.
The basic model of this product is one-way test. If users need to order with two-way test at the same time, please make a request and our company will give special customization.

二、Technical specifications

1.Main features
◆Small size, easy installation;
◆Simple structure, easy operation and maintenance;
◆High braking moment;
◆High accuracy of measurement;
◆Work stably and reliably;
◆Achieving High Precision Instantaneous Speed Measurement with Magnetoelectric Velocity Sensor;
◆Fast Load Control of Electronically Controlled Butterfly Valve;
◆Fast response, suitable for dynamic test

2.Measuring performance indicators

Project sensor type Measuring range Accuracy Remarks
Rotating speed ZSB magnetoelectric speed sensor 300-7500r/min ±1r/min
Greater than 7500r/min
When the speed wheel and control components are treated separately.
Torque Strain gauge tension sensor Match the dynamometer range ±0.2% FS
Water valve position
Precision potentiometer
(DPF, YZ60 Watergate Actuator)
0-100% 0.2% FS
Throttle position
Precision potentiometer
(YZ60, YZ60A throttle actuator)
0-100% 0.2% FS

3.Technical parameter


Hydraulic dynamometer model
YP60 YP120 YP250 YP380 YP520 YP660 YP880 YP1200 YP1900 YP2500 YP3300
Maximum absorption rate (KW) 60 120 250 380 520 660 880 1200 1900 2500 3300
Torque measurement accuracy (FS) ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2%
Speed ​​measurement accuracy (FS) ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰
Spindle rotation direction unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional
Brake force measurement range (N) 0~180 0~550 0~1000 0~1300 0~2500 0~3300 0~6000 0~12000 0~18000 0~27000 0~35000
Maximum braking torque (Nm) 172 525 980 1240 2450 3150 5700 11760 17200 26460 33400
Maximum water consumption (Kg/h) 1200 2400 5000 8000 10400 13900 18500 24000 36300 50000 66000
Drainage maximum temperature (°C) 70 70 70 70 70 70 70 70 70 70 70
Total length of the spindle 448 510 500 500 600 600 802

1296

1296 1440 1440
Spindle cone length and taper 63, 1:30 70, 1:30 70, 1:30 70, 1:30 70, 1:30 80, 1:30 100, 1:30 192, 1:30 192, 1:30 170, 1:30 170, 1:30
The center of the spindle is high to the bottom of the base 255

300

300 300 350 350 650 760 760 840 840
Dynamometer dimensions (length × width × height) 450×400×370 655×530×430 640×536×460 640×536×460 760×620×543 760×620×543 1078×845×905 1598×.51310×1135 1598×.51310×1135 1452×1558×1310 145×21558×1330
Base size (length × width × height) 640×400×90 640×394×110 640×400×100 640×400×100 760×490×120 760×490×120 1060×820×310 1476×1200×260 1476×1200×260 1256×1559×260 1256×1559×260
Foot screw hole position 590×340 600×335 580×330 580×330 700×420 700×420 990×650 1350×1074 1350×1074 1421×1116 1420×1116 
(×690)
Dynamometer net weight (Kg) 170 180 200 200 410 435 950 2800 2900 3200 3300
Maximum spindle speed (r/min) 9000 7500 7500 5000 5000 3500 3000 3000 3000 3000 3000
Moment of inertia 
(Kg.M2)
0.012 0.041 0.065 0.074 0.480 0.511 0.721 3.6 4 6.8 7.1

Table units:mm

4. characteristic curve

The application scope of hydraulic dynamometer can b e seen from its characteristic curve as shown in Fig. 1 (a), (b), (c), (d), (e), (f), (g), (h). Characteristic curve shows the power range that dynamometer can absorb at different rotational speeds.
The OA curve represents the maximum power line that the dynamometer can absorb with the change of rotational speed under a certain inlet pressure.
When AB line keeps the dynamometer's maximum torque, the maximum power line that dynamometer can absorb will change with the speed.
When the AC line (YP20) and BC line are not more than the maximum permissible discharge temperature of dynamometer, the maximum power limit line that dynamometer can absorb.
CD line is the maximum speed limit line of dynamometer.
OD curve is the braking power line (air friction resistance) of Dynamometer when it is not filled with water.
The area surrounded by the curve graph OABCDO indicates the power range that the hydraulic dynamometer can absorb. This is also the basis for choosing dynamometer in power machine performance test. In general, all the characteristics of the power machine can be tested on this type of hydraulic dynamometer within the range of curve and figure.
﹡When choosing dynamometer, users must pay attention to whether the test point of the dynamometer is within the range of the characteristic curve of the dynamometer and avoid the edge of the curve as far as possible.
﹡The minimum absorptive power line (full open position of butterfly valve) is slightly higher than OD line under the optimal control of water filling, and should not be too close to OD line when selecting type.

三、Structure of dynamometer

YP type hydraulic dynamometer is mainly composed of body parts, force measuring mechanism parts, intake and drainage parts, correction parts, electric drainage valve parts, automatic regulating device parts and lubricating parts. See Figures II (a), (b).
1.Body parts
The body parts are the main parts of dynamometer to absorb the effective torque of power machine by using water. See Figures III (a), (b).
The mechanical energy output from the power machine is converted into heat energy here, which is absorbed by the water entering the shell and discharged. A very small part of the mechanical energy is dissipated to the air by the wall of the dynamometer shell.
The simple structure consists of a swinging housing mounted on a rolling bearing and a rotor mounted on a spindle. The dynamometer rotor is installed in the middle of the main shaft, and the left and right side shell and the left and right bearing shell are symmetrically installed on both sides of the rotor. The working cavity is formed by the rotor pit and the left and right side shell pit. The bimetallic bushing connected with the shell of the left and right bearing not only acts as the bushing, but also acts as the sealing water. YP880, Y1200, YP1900, YP2500, YP3300 and YP5900 dynamometers are sealed by clearance to prevent water from entering the bearing, thus ensuring the service life of the bearing.
There are drainage holes on the shell and water intake holes on the left and right bearing shell to ensure the entry of low-temperature water and the discharge of high-temperature water. There is an overflow pipe in both the left and right bearing housing, and the water thrown out by the water throwing ring is discharged after the overflow pipe enters the base.
The spindle is equipped with coupling at both ends of the cone, and the speed measuring gear is installed on one side. Through the speed measuring sensor, the spindle speed can be displayed in the digital display table.


Figure two(bY880-SY1900-S、Y3300-SOutline schematic diagram of hydraulic dynamometer

1、Body parts2、Dynamometer unit 3、Lubrication parts 4、Intake and drainage components5、correcting member6、Automatic adjusting device components

Figure three(a)YP1900Structural sketch of airframe components

1、base  2、Left and Right Bearing Seats  3、Spindle components  4、Coupling  5、Bearing plate  6. Skeleton oil seal 7, axle sleeve 8.9, bimetal axle sleeve & nbsp; 10, left and right bearing shell & nbsp; 11, left and right side shell & nbsp; 12, screw & nbsp; 13, rotor 14, shell & nbsp; 15, water seal ring & nbsp; 16, speed measuring gear & nbsp; 17, speed sensor & nbsp; 18, overflow pipe & nbsp; 19, cock

Figure three(b)YP1900Structural sketch of airframe components

1、base 2. Bearing seat 3, coupling 4, spindle component 5, bearing shell 6, shell 7, side shell 8, rotor 9, speed sensor 10, speed measuring gear


2.Force measuring mechanism components
The components of force measuring mechanism are used to measure braking force, as shown in Fig. 4 (a), (b).

It is mainly composed of brake arm, tension pressure sensor and movable bolt. The braking moment produced by the body parts is balanced with the reaction moment of the brake arm pull-up pressure sensor, and the braking force is displayed by an electronic digital display instrument. In order to protect the sensor, nylon ring or rubber ring is installed at one end of the movable plate bolt to play a buffer role. At the same time, in order to prevent the sensor from being damaged by vibration in transportation, a supporting and fixing protection device is provided. The bolt of the fixed sensor must be loosened in use, and the movable plate should be pulled to one side. If there is no movable plate, the bolt can be screwed off.


Figure four(a)YP20、YP60、YP120、YP250、YP380、YP520、YP660

Drawing of Force Measuring Mechanism Components

1. Brake arm 2, tension and pressure sensor 3, movable bolt 4, support 5, protective cover 6, movable plate 7, bolt 4


Figure four(b)YP1900Schematic diagram of dynamometer mechanism

1. Brake arm 2, fixed bolt 3, movable bolt 4, tension pressure sensor


3、Intake and drainage components
The intake and drainage components are composed of intake components and drainage components. It is mainly used for entering low temperature water and discharging high temperature water when dynamometer works. See Fig. 5 (a), (b).
YP60, YP120, YP250, YP380, YP520 and YP660 hydraulic dynamometers are composed of brackets, pipes and elbows. The elbows are connected with the left and right bearing housing of the body parts to form the intake pipeline of the dynamometer.
The drainage components are composed of brackets, pipes and elbows. The elbow is connected with the outer shell to form a drainage pipeline of dynamometer. The water thrown out by the water throwing ring in the body parts is discharged after the overflow pipe enters the base.

The intake parts of YP880, YP1200, YP1900, YP2500, YP3300 and YP5900 dynamometers are composed of intake valve parts and intake pipes. The drainage components are composed of a drainage butterfly valve, a drainage elbow and a drainage actuator.


Figure five(a)Drawing of Intake and Drainage Components

1. Overflow pipe 2, permeable pipe 3, intake parts (5, elbow 6, pipeline 7, bracket) 4, drainage parts (8, bracket 9, pipeline 10, elbow)

Figure five(b)Y880-S、Y1900-S、Y3300-SDrawing of Intake and Drainage Components

1. Spillway 2, Intake Component 3, Drainage Actuator 4, Drainage Butterfly Valve 5, Drainage Bend

4、  Calibration Component (Static Calibration Component)
Calibration components are used for static calibration of dynamometers, as shown in Fig. 6.
It is mainly composed of calibration arm, lifting parts, suspenders, trays and weights.
The distance L from the center of dynamometer spindle to the triangular knife edge of static calibration arm and the total weight W are shown in the table below.
L and W values


Model Arm lengthL(mm)±0.125 Weight total weightW(kg)
YP60 973.8 18
YP120 973.8 55
YP250 468.9 200
YP380 486.9 260
YP520 973.8 250
YP660 973.8 330
YP880 973.8 600
YP1200 1947.5±0.30 600
YP1900 1947.5±0.30 900
YP2500 1947.5±0.30 1350
YP3300 1947.5±0.30 1750

Fig. 6. Schematic diagram of correction components
1. Correction arm 2, lifting parts 3, lifting rod 4, tray 5, weights

5. & nbsp; Electric Drainage Valve Components
DPF electric drain valve components are used to automatically control the opening position of the drain valve, adjust the pressure of the dynamometer chamber, so that the thickness of the water ring changes with the change of working conditions, that is, to change the absorption load, as shown in figure 7.
It is mainly composed of shell, moment motor, planetary gear pair, butterfly valve, potentiometer and so on. Matching with the electronic control cabinet, the opening of the valve can be controlled by the compartment.

YP60、YP120、YP250、YP380、YP520、YP660 Hydraulic dynamometers use this form to control the drainage butterfly valve



Figure sevenDiagram of DPF Electric Drainage Valve Components

1. Potentiometer 2, Torque Motor 3, Planetary Pair 4, Shell 5, Butterfly Valve

6、   Automatic adjusting device components
The components of the automatic regulating device control the opening position of the valve slice of the drainage butterfly valve through the drainage actuator, and adjust the pressure of the inner chamber of the dynamometer to change the load, as shown in figure 8.

Fig. 8. Component sketch of automatic regulating device
1. Drainage Actuator 2.3, Gear Pair (Synchronized Tooth Belt) 4, Angle Iron 5, Drainage Butterfly Valve 6, Support Plate

It is mainly composed of drainage actuator, drainage butterfly valve, supporting plate, gear pair, etc.

YP880, YP1200, YP1900, YP2500, YP3300, YP5900 hydraulic dynamometers all use this form to control the drainage butterfly valve.

YP880, YP1200, YP1900 dynamometers are equipped with YZ60A drainage actuator produced by our factory, YP2500, YP3300, YP5900 dynamometers are equipped with YZ20 drainage actuator.


7、Lubrication parts
Lubrication parts are mainly used for rolling bearing lubrication of dynamometer.
YP60, YP120, YP250, YP380, YP520 and YP660 hydraulic dynamometers are all lubricated with grease, and their locations are shown in Fig. 2 (a). ZL45-2 lithium-based grease can be directly injected into the pressure oiler (tanker). The specific requirements are shown in Schedule 4.
The lubrication components of YP880, YP1200, YP1900, YP2500, YP3300 and YP5900 hydraulic dynamometers are shown in Figure 2 (b). Oil mist lubrication, drip oil lubrication and pump oil lubrication can be used respectively according to user's requirements and different working conditions.

(1)Oil mist lubrication

Oil mist lubrication can be used when dynamometer works at medium and high speed. Oil mist lubrication is mainly composed of gas source, pressure reducing valve, oil mist, gas pipe and so on. V-01/10 compressor can be used as gas source for a single dynamometer. Before starting the dynamometer, it is necessary to ensure the normal operation of the oil mist system. Oil mist lubrication is detailed in the instructions for the use of oil mist lubrication devices.

(2)Drip lubrication When the dynamometer works at a low speed, it can adopt drip oil lubrication instead of oil mist lubrication or pump oil lubrication.

If the working speed of YP1900 hydraulic dynamometer is below 2200 r/min, and YP3300 hydraulic dynamometer is below 1800 r/min, oil drop lubrication can be used.

(3)Pump oil lubrication

When the dynamometer works at a high speed, in order not to make the bearing temperature rise too high, the pump oil lubrication can be used.

Pump oil lubrication is mainly composed of pumping station and inlet and outlet oil system. Pump oil lubrication must start the pump station to lubricate the bearing of dynamometer before starting the dynamometer main engine and adding water for testing. Pump

oil inlet pressure can be adjusted by LI-10 throttle valve, and the pressure can be controlled in the range of 0.01-0.05 Mpa. It is suggested that as long as the working conditions are satisfied, the pressure should be as low as possible to reduce leakage.

四、Working Principle and Power Calculation of Dynamometer

1、 Working principle

The power machine drives the rotor components on the dynamometer spindle to rotate synchronously through the coupling, which stirs the water in the working chamber. Because of the centrifugal force produced by rotor rotation and the effect of rotor pits, water produces strong water eddy current between the side shell and the rotor pit. It gives the shell a rotating moment, so that the torque of the power machine is transmitted from the rotor to the shell. The brake arm mounted on the shell will rotate at an angle, so that the brake force is transmitted to the tension pressure sensor connected with the brake arm through the electronic digital display device. Display the braking force.

The dynamometer controls the opening of butterfly valve by electric drainage valve or drainage actuator by automatic regulating device. The opening of butterfly valve is controlled by drainage actuator to change the pressure of water in the working chamber of dynamometer to change the absorption power. At the same time, the speed of dynamometer can be measured by the speed sensor and displayed on the electronic display instrument.

Because it is a pressure-controlled hydraulic dynamometer and adjusts the pressure of working chamber by changing the opening of butterfly valve, the whole process must be an automatic closed-loop control system, so the pressure YP dynamometer must be equipped with an electronic control cabinet with automatic control function to operate.

2、 Calculation
(1)Power calculation
The effective power of dynamometer can be calculated by the following simple formulas when the length of statically calibrated arm is 973.8mm, guaranteed by the structure design.:
P= F n/ 10000 (Kilowatt)
Type: F--- loading (Newton)
N - Speed (Rotation/Point)
(2)Torque calculation
M=F.L (N.M)
Type:F---load(Newton)

L---Calculated arm length is 0.9549(m)

五、Water supply system of dynamometer
The water supply of dynamometer can be used in circulating water supply system. The water supply is provided by high pressure stabilizing water tank or low pressure stabilizing water tank plus pipeline pump. Generally, the indoor water tank in the north is composed of a low-level stabilized water tank and a pipeline pump (see figure 8).
The intake pressure of dynamometer can be greater than or equal to 0.05 MPa, usually 0.05-0.15 MPa. When the dynamometer works on the full water line, it requires higher water supply pressure; when it works below the full water line, the water pressure can be lower. The water supply pressure should be kept stable, and the range of pressure fluctuation should be (+5KPa). When the dynamometer works, the water supply pressure directly affects the cavitation degree of the side shell of the dynamometer and the concave working chamber of the rotor.
In the process of dynamometer operation, water intake can not be interrupted. The water intake is about 20 liters per kilowatt hour, the drainage temperature can not exceed 70 ~C, and the general economic drainage temperature is between 55 ~60 ~C.

The circulating water supply system is mainly composed of heat sink, water pump, stabilized water tank, intake and drainage connection pipeline, water pressure meter, valve and so on. The volume of the pool should consider heat dissipation and measure the maximum power consumption, and there is a certain amount of surplus to compensate for water dissipation in the process of circulation. It is suggested that the volume of the pool should be increased as much as possible when conditions permit. The volume of water tank should be considered when the maximum water consumption is constant water supply (see the table of technical parameters for water consumption). When the water supply of the pump is larger than the maximum power consumption of the dynamometer, the volume of the stabilized tank can be recommended to be about 2-5 M3. The smaller the water consumption is, the larger the water consumption is. The volume of the tank is generally about five times that of the tank. If conditions permit, try to be as large as possible.

The diameters of intake and drainage pipes should meet the requirements of the diameters of intake and drainage of dynamometers.

A gate valve and a water pressure gauge shall be connected in series in the intake pipeline. The gate valve is used to regulate the intake pressure. For a fixed engine type, it usually stops moving after one adjustment. Therefore, the gate valve can be installed in any convenient position, while the ball valve on the dynamometer intake pipe is used for opening and closing water supply.

Drainage pipes are generally larger than intake pipes. Drainage pipes can be circulated through clay pipes to the pool. If the user's water source is rich, it can also be discharged into the sewer. Two problems should be paid attention to in drainage pipeline: one is that the drainage can not be connected with the overflow pipe to prevent the overflow pipe from backfilling with excessive drainage pressure; the other is that if the drainage pipeline is not smooth, it will cause excessive backpressure, which will affect the normal test of dynamometer. Therefore, the pipeline arrangement should be as short as possible and with fewer elbows.

The circulating water will be used as dynamometer water after descaling, which will reduce the formation of scale in dynamometer. If there is no water treatment equipment, tap water or clean river water is allowed, but no sediment and other impurities are allowed to mix in. It is not suitable to use sea water. Depending on whether the PH value of water in different areas is high or not, it is necessary to install scale remover.

Figure nine Schematic diagram of water supply system

六、 Installation of dynamometers
1、 Bench Foundation
The test bench foundation is used to install dynamometers and engines. The quality of foundation design will have a great impact on the quality of test. In the design of bench foundation, the following aspects should be considered.
(1) The test-bed should be close to the side of the water source, and the distance between the foundation and the wall should be no less than 1.5 meters. Attention should be paid to the position of the calibration arm when the dynamometer is away from the wall. The whole laboratory requires good ventilation, sufficient light and lighting equipment to meet the requirements.
(2) The base of the bench should have enough mass to minimize the vibration of the bench. The foundation shall be poured with concrete of No. 90 and the proportioning shall be 1 portion of cement: 2.5 portions of yellow sand and 4 portions of stone by volume. Foundation pouring should take into account the measured object, so that the installed dynamometer can test various types of power engines. The position of foundation bolt can be constructed according to figure 10. (Fig. 10 is the foundation map of the installation of hydraulic dynamometer)
(3)Effective vibration isolation measures should be taken to reduce the transmission of vibration energy from the test bed to the outside world. The simple way is to lay a layer of yellow sand under the concrete foundation, and open a 200 mm wide and 800 mm deep anti-seismic groove around the foundation, fill it with sawdust or slag, and cover it with asphalt.
(4)Underground buried pipeline should be carried out before concrete pouring. If the exhaust pipe of power machine is installed underground, it should be more than 0.5 meters away from the pipeline.
2、Installation of dynamometer
Before tightening the anchor bolts, the dynamometer should be calibrated in two vertical directions with the installation accuracy of 1/1000 to ensure the sensitivity and correctness of dynamometer test.
3、Installation of Power Machine
Power machine should be installed according to the requirements of power machine. For some benches with changeable power model, it is better to install the power machine on the accessory bracket with three degrees of freedom (which is supplied by our factory), so as to make the installation and adjustment more convenient. When installing the throttle actuator in the engine, it is necessary to ensure that the stroke of the engine speed control handle is within the stroke of the throttle actuator.
4、Join
Universal coupling or elastic coupling should be used to connect dynamometer with power motor. When using rigid coupling, special attention should be paid to the coaxiality of two-axis installation. Generally, the coaxiality should be within 0.05 mm.
No matter which connection mode, the additional moment and axial force acting on dynamometer should be reduced as far as possible, so as not to cause fever, equipment and life accidents, so that normal testing can not be carried out. It is suggested that an auxiliary support should be installed near the end of dynamometer, which is a better method.
No matter which connection mode, the additional moment and axial force acting on dynamometer should be reduced as far as possible, so as not to cause fever, equipment and life accidents, so that normal testing can not be carried out. It is suggested that an auxiliary support should be installed near the end of dynamometer, which is a better method.


Fig. 10 Foundation Map for Installation of Hydraulic Dynamometer


The dimensions, intake and drainage diameters and locations of the installation foundation are shown in the table.

List of Foundation Dimensions for Installation of YP Hydraulic Dynamometer and Location of Overflow and Drainage Port of Dynamometer Base

Model
A
B
C
D
E
F
G
H
J
K
N
S
Z×L
M
W
g
YP60
1500
1400
500
25
750
900
640
390
340
590
25
90
4-M16×520
335
YP120
1600
1500
500
30
750
900
640
394
335
600
22.5
110
4-M16×540
350
YP250、YP380
1600
1500
500
30
750
900
640
400
330
580
28
100
4-M16×540
340
YP520 YP660
1750
1600
600
30
850
1050
760
490
420
700
35
120
4-M20×570
400
YP880
2000
1800
1200
35
1160
1400
1060
820
650
990
85
310
4-M22×800
/
384
351
YP1200
YP1900
2450
2180
1300
63
1600
1876
1476
1200
1074
1350
63
260
4-M30*1000
/
0
YP2500
YP3300
2560
2250
1500
69
1656
1959
1559
1256
690
1116
1421
70
260
4-M30*1200
/
0
nothing

List of Intake and Drainage Diameters and Locations of YP Hydraulic Dynamometer

Model Inlet caliber Drainage caliber X Y Q
YP60 G1″ G1 1/4″ 143 143
YP120 G1 1/4″ G1 1/4″ 165 165
YP250、YP380 G1 1/4″ G1 1/4″ 162 162
YP520、YP660 Φ50 ZG2″ 221 221
YP880 ZG2″ Φ54 0 354
YP1200、YP1900 ZG3″ Φ85 151 581
YP2500、YP3300 ZG5″ Φ130 203 669

The table is not marked in millimetres.

七、Calibration of Dynamometer
Static arm is generally designed as 973.8mm. Put 1 kilogram of weights on the weighting tray and display 10 Newtons correspondingly; 2 kilograms show 20 Newtons....
For structural reasons, if the arm length is enlarged or reduced to a certain magnification, the display value should also be enlarged or reduced to the same magnification.
The specific operation is as follows:
1. Install static calibration tools: calibration arm and hanging basket; 2、For digital calibration of instrument, please read EMC900 instruction for calibration operation. 3、Remove the calibration tool at the end of calibration. 4、EMC900 controller must be restarted until the end of 100 seconds countdown.
八、Use of dynamometer
1、Before boot

(1) Loosen the bolt of the sensor protection device to make the stator free.

(2) Check the connection between coupling and spindle.

(3) Check the coaxiality of the power machine and dynamometer.

(4) Check the connection and circulation of the inlet and outlet pipe systems.

(5) Clean the appearance, add lubricating oil to each lubrication point, and rotate the spindle to check whether the rotor and other components have collision and rotation inflexibility.

(6) The calibration meets the requirements.

(7) Fully open drainage butterfly valve (minimum load position).

2. Start-up test

(1) Start the power machine to drive the dynamometer spindle to rotate at the same speed. After the power machine is running normally, the test can be carried out.

(2) Fully open the intake valve and adjust the opening of the drainage butterfly valve until it is consistent with the working condition of the power engine.

(3) Four control modes, namely, constant position, constant torque, square torque and constant speed, can be selected to control the electronic control cabinet matched with dynamometer in the test of engine external characteristics, speed regulation characteristics, load characteristics and other characteristics.

(4) For some engines, sometimes the water supply pressure of a fixed dynamometer can not meet the test requirements of all working conditions, which can adjust the water supply pressure properly under different test conditions.

3. End of the experiment

(1) Close the intake valve.

(2) Fully open drainage valve.

(3) The engine runs at low speed for several minutes and then stops.

(4) Rotary sensor protection device, so that the stator is locked, the sensor is not forced.

(5) Cut off the power supply connected with the electronic control cabinet.

(6) Stop lubricating system oil supply.

(7) If the test is not done for a long time, the bottom drain valve of dynamometer should be opened to remove the accumulated water. If conditions permit, the upper end of the shell screw (except YP1900) can be unscrewed and the accumulated water can be purged with compressed air. The position of the screw is shown in Fig. 3 (a), (b).

In order to prevent bearing from entering water, please remember!!! The principle of "first start, then drain; first shut down, then shut down". To ensure that the dynamometer in the rotating state of water, but also should prevent the dynamometer in the anhydrous state of continuous operation for too long and burnt the sealing parts. (Require anhydrous working time is not more than 2 minutes.)

【Refresh】【Favorites】【Print】 【Close】
Previous:Two box temperature shock test chamber Next:YPS type unidirectional hydraulic dynamometer
国产激情AV| 亚洲情a| 亚洲情色一区| 综合久久六月| 狠狠色丁香乆乆| 俺去也婷婷| 男人天堂99| 性色天| 亚洲狠狠狠| 很很操96| 九九热这里只有精品7| 五月婷婷综合性爱噜噜| 婷婷九月久久| 五月丁香婷婷99| 久久无码成人| 五月婷婷六月天| 99re这里| 亚洲无码99| 婷婷丁香九月| 精品久热69| 五月人妻婷婷视频| 99亚洲无码| 婷婷五月天激情AV影院| 26uuu欧美亚洲日韩| 亚洲视99| 丁香五月色情| 激情五月,色五月| 久久大香蕉同僚| 在线超碰91| 七七色综合| 琪琪色五月婷婷老师| 天天干天天爽| 中文字幕免费高清电视剧| 成人午夜无码视频| 久操热线| 99免费在线视频| 色啪网| 五月婷婷激情综合| 婷婷视频网| 亚洲旡码| 亚洲爆乳无码精品AAA片蜜桃| WWW.色婷婷.COM| 久久奄也去色色网站| 五月婷成人网| 五月丁激情| 五月丁香六月婷婷中文版| 综合久久婷婷五月丁香| 天天噜天天爱| 久久66精品| 色5月婷婷| 永久AⅤ1| 色综合色| 99热碰碰热| 亚洲精品电影| 欧美精品XXXXBBBB| 亚洲成人在线观看av| 99久久婷婷国产综合精品草原| 九九99精品视频| 91丁香五月| 黄色五月婷婷| 狠狠色丁香| 97人人干| 啪啪一区| 五月天啪啪网| 色五月97| 伊人激情啪啪| 国产噜一噜天天噜| 丁香色啪综合| 色99欧洲色19| 色婷婷五月色| 日韩色色视频| 色婷婷成人做爰A片免费看网站 | EEUSS鲁片一区二区三区| 婷婷狠狠操| 这里只有精彩视频| 男人先锋久久| 奇米网大香蕉| 日韩另类| 色婷婷成人在线| 狠狠操狠狠狠| 五月天婷婷综合免费| 五月天激情小说网| 99在线小视频| 中文字幕日产A片在线看| 日本欧美成人片AAAA| av在线婷婷| 伊人久久大香天蕉亚洲特级| 欧美精品999| 五月激情丁香六月狠狠干| 婷婷伊人激情婷婷| 五月天另类图片| 成人网大全| 激情综合五月| 99原创自拍视频在线观看| 超碰无码老师| av国产精品偷| 五月天色婷伊人| 丁香网五月天激情| 狼人狠狠操| 最近中文字幕2019视频1| 天天综合天综合久久网| 久9精品| 涩涩五月天综合| Jh7Uf088VHafNm| 婷婷五月天无码| 91视频精品99| 欧美怡红院黄站| 综合久久久婷| 激情美女五月天| 欧美激情凹凸丁香网| 丁香婷五月天开心六月| 亚洲五月花| 国产婷伊人| 91久久免费| 五月丁香| 婷婷色情五月| 99人妻碰碰碰久久久久禁片| 丁香操逼| 色狠狠综合| 亚洲九九在线| 亚洲另类婷婷综合| 亚洲色区17| 97人妻碰碰中文无码久热丝袜| 91久久久久久| 激情综合网五月激情| 五月丁香无码| 黄色网址五月婷婷| 九九九日本熟女| 米奇影视资源婷婷狠狠色激情欧美五月丁香| 在线播放成人网站| 丁香五月激情婷婷| 国产成人+综合亚洲+天堂| 久爱综合| 男人天堂99| 亚洲综合婷婷| 大香蕉婷婷久久| 91男人操女人视频| 99久re热视频精品98| 日韩欧美骚货| 亚洲久热| 99视频网址| 五月婷婷中文网| 激情六月丁香| 久久色午夜在线导航| 亚洲婷婷五月天综合| 天天精品视频免费观看| 丁香伍月婷电影全集| 永久免费视频| 五月丁香人妻| 熟妇人妻中文字幕无码老熟妇| 色色综合网www| 91精品久久久久久久| 五月网网站| 天天天干夜夜夜操| 草草操操| 五月婷婷五月天激情网| 色色婷婷综合| 欧美婷婷五月无砖| 五月天婷婷免费| 久操乱| 欧美激情五月综合| 蜜桃人妻无码AV天堂三区| 成人.在线日韩| 无码色色色色色| 99久在线精品99re8热| 99色在线观看| 婷婷,五月天,丁香,第一| 五月丁香六月玩女人| 熟女少妇内射日韩亚洲| 久久色婷婷| 青青草激情网| 婷婷五月性感| 五月天婷婷影院影院| 99在线观看| 啪色综合| 99re思思久久| 超碰99热精品在线| 日本在线免费中文com.| 欧美激情综合| 久热一本| 五月天婷婷激情| 墨西哥毛片内射精| 丁香五月中文字幕久色| 68热超碰在线| 色播播之激情五月婷婷| se99视频| 婷婷五月天久久久| 丁香六月啪啪啪| 九九激情视频| 99热| 九九久久99| 99视频自拍| 干一干xxxx| xxx.色婷婷| av高清无码| 这里只有视频精品| www.狠狠| 99色视| AV在线免费播放| 五夜丁香| 婷婷 色 丁香 夜| 中文字幕操比影片| 伊人婷婷五月天av| 天堂在线伊久| 五月婷婷六月婷| 色色五月婷婷网| 五月天亚洲最大成人| 丁香六月欧美| 天天舔天天摸天天射| 丁香五月Av| 五月天激情黄色小说在线观看| 思思热久久婷婷五月天| 9精品久久999| 色播丁香婷婷五月激情| 97超碰,人人舔,人人操,人人摸| 丁香婷婷久久| 网站免费一站二站| 婷婷五月天激情文学小说| 亚洲成人在线播放| 韩国情人在线电视剧免费观看高清版全集 | www.91色| 俺也去婷婷五月天第五色| av网址在线| 亚洲另类婷婷综合| 大香蕉五月丁香| 色色五月天丁香| 日本99在线视频| 99色干| 九九激情综合| 最新午夜理论片| 免费看欧美成人A片无码| 怡红院99| 久久一级AV| 五月婷婷插一插| 亚洲日本三级片| 26uuu亚洲精品国产| 日韩三级视频一区二区| 天天撸天天射| 99操逼| 久久a热| 日本色婷婷五月天成人电影| 成人超碰网| 五月天俺去也| 99久精品| 玖玖综合网| 婷婷色婷婷亚洲成人| 99视频在线精品| 天干干夜夜操| 色吧网综合| 五月丁香激情综合网| 午夜婷婷久久| 丁香六月婷婷综合激情欧美| 婷婷五月丁香影院| 日韩AC在线免费观看| 天天天综合网| 久久92| 日韩视频99| 综合久久丁香婷婷,五月婷婷六月丁香,开心激情综合网,六月丁香在线观看,婷婷丁 | 精品无码色欲AV| 亚洲偷| 开心网五月色婷婷| 成人短视频在线| 噼里啪啦完整版中文在线观看| 色情综合| 激情五月婷婷| 噜噜狠狠色综无码久久合欧美| 丁香五月激情啪啪啪啪| a久久| 日木狠狠干| 九九九九精品精| 亚洲色情在线| 色丁香久久| 99热国品| 五月天激情婷婷久久| 大香蕉婷婷久久| 天天综合色| 伊人深爱综合| 色婷丁香| 国产一区二区av免费| 五月色影院| 婷婷丁香五月麻豆| 91无码色色| 亚洲操操操| 色视频2025| 日本美女97在线视频| 天堂资源8| 激情色中文| 久久综合最新网址| 欧洲毛片基地c区| 丁香五月综合福利视频导航| 五月天AV大香蕉| 丁香婷婷深情五月亚洲| 激情网综合| 五月天婷婷av| 伊人婷婷福利网| 97色婷婷| 五月丁香色狠狠干大屄| 婷婷五月丁香综合激情| 影音先锋五月婷婷| 日本片日本片祼观看网站在线看中文版网页在线看| 激情综合五月激情17| 精品热九九| 成人在线综合| 欧美猛片| 人妻AV在线观看| 婷婷色五月大香蕉在线| 久久婷丁香五月| 九九热思思热| 久操福利| 丁香五月综合狠狠| 婷婷色影院| 无月播播激情在线观看视频| 2015好吊操| 日韩美一级毛卡片| 成人免费120分钟啪啪| 性色五月天| 婷婷五月深深的爱| 色婷婷综合亚洲| 亚洲性爱AV在线| 九色91视频| 婷婷五月天亚洲综合| 久久五月丁香| 色青五月天| 日本综合色图| 热久久91| 五月婷婷啪啪| 五月天色婷婷基地| 五月天狠狠网站| 日本色色影院| 超碰人妻公开在线| 色婷婷五月天偷拍| 九色七七| 怡红院视频| 五月天三级| 日韩人妻在线观看| 婷婷五月娱乐在线| 久久怡红院| 狠狠操狠狠爱| 999激情视频| 影音先锋777xfplay色资源网站| AV在线观看网站| 丁香五月亚洲综合| 搡BBBB搡BBB搡18| 一级精品999WWW| 五月天久久网站| 99热99热在线观看| 亚洲色综合| 亚洲成人九九九| 亚洲免费综合一区| 国产成人精品一区二区三区视频| 中文字幕乱轮| 五月丁香 久久久| 色婷婷电影网| Www99热| 国产高清视频91九九九久久久| 伊人狠狠丁香婷婷综合尤物| 综合色色色| 丁香五月网在线观看| www.激情五月天.com| 色一情一乱一乱一区91| 丁香 久久| 九九热青青草| 色99xx| 欧美婷婷色| 人妻丰满精品一区二区A片| 九色91国产| 99热在线观看| 天天天干夜夜夜操| 综合婷婷五月丁香在线观看| 日日做天天操夜夜爽| 激情小说五月丁香在线视频观看视频| 人妻在线网站| 免费V片在线| 91麻豆国产三级精品福利在线观看| 123草逼网| 亚洲视频色婷婷| 俺也去在线视频| 激情综合网 激情五月天| 丁香六月色情| 丁香五月婷婷88在线| 99惹| 色必久悠悠影院| 亚洲激情综合色站| 激情五月天在线观看婷婷| 九九久久五月天综合伊人| 99男人天堂| 日本天堂爱爱| 在线另类视频| 久操热线| www久久99com| 婷婷丁香六月五月天| 欧美va精品va老师va| 久久99免费视屏| 精品久久99| 激情五月天婷婷直播| www99热| 99热久| 青青草性爱视频| 五月丁香婷婷爱激情综合网| 久久五月天合网| 天天射影| 五月婷婷深深爱爱| 丁香婷婷偷拍| 99精品7| 婷婷色情五月| 五月婷婷六月丁香综合在线| 免费观看的av| 婷婷欧美综合| 五月婷婷色| 无码AV免费精品一区二区三区| 99热人人| 丁香五月婷婷五月| 五月婷婷六月丁香| 亚洲无码性爱| 丁香五月天亚洲综合| 日本九九九九九九| 五月色色网| 玖玖视频福利| 久色视频首页| 色五婷婷| 人人摸人人澡人人| 丁香五月婷婷六月| 67194国产| 久久这里只有精品视频15| 国产亚洲成人综合| 任你操精品免费| 少妇高潮一区二区三区99欧美| 91九色 婷婷| 婷婷中文在线| 亚洲色五月天是什么| 新激情五月天色播| 五月四房播播| 婷婷香五月天| 这里只有精品96| 九九热99久久99| 五月综合丁香婷婷| 777久久综合视频| 丁香激激情网| 开心四房播播| 丁香五月六月| 67194线路二在线观看| 综合色婷婷| 大香蕉五月天婷婷| 加勒比色色| 丁香色综合| 天天综合五月天| 激情五月婷婷| 狠狠爱丁香婷| 9久久久久| 色亚洲中文| 丁香六月无码播放| 武则天精品久久| 伊人在线视频| 丁香狠狠操| 丁香久久| 日本五月视频| 色五月五月婷婷| 成人做爰A片免费看视频| WWW久久99久久99久久| 14色综合婷婷| 色综合色欲综合天天免费 | 99综合激情久久精品久久| 色五月 五月婷婷| www.日日夜夜.com| 日韩人妻在线播放| 色五月91| 999热成人在线综合网| 亚洲av日韩无码| 婷婷九月| 激情视频91| 激情校园 亚洲| 五月婷在线观看| 婷婷五月情| 99精彩视频在线观看| 大香蕉久| 17.c黄色| 色五月婷婷丁香五月| 第四色色色色色丁香五月天| 99热久| 六月婷婷久久大全| 五月丁香啪啪综合| 激情婷婷五月天丁香| aaa丁香五月天| 色色色.COM| 五月综合久久| 97碰碰人人视频| 亚洲国产色婷婷| 天天舔天天操| 成人免费120分钟啪啪| 五月五月婷婷| 69婷婷丁香午夜| 日本欧美成人片AAAA| 色婷婷基地 | 五月婷婷激情久久| 丁香五月综合亚洲| 婷婷狠狠操| 欧美碰碰| 国产欧美日韩一区二区三区| 伊人超碰| 成人网页在线观看| 久久婷婷操| 亚洲黄色影视| 天天综合91入口| 色婷婷色五月色丁香| 婷婷综合视频| 久久九九经典| 先锋资源 996| 99热9| 免费看无码视频A级| 视频这里只有精品16| 久久精典| 婷婷九月丁香天堂丁香天堂| 五月综合六月丁| 激情综合色| 久久综合网桃花| 激情久久五月网| 99热精品在线| 成人综合视频在线| www.99情趣网| 2025神马午夜福利| 凹凸7777操操操| 五月丁香色综合| 欧美日韩精品一区二区三区钱| 色婷婷欧美| 日韩色色视频| 亚洲日比视频| 一二三区视频韩国| 777精品久无码人妻蜜桃| 99a级片| 九九99精品视频在线观看| 99燥99日| 天天爱天天做天天舔| 99黄色性生活| 亚洲一级色电影| 婷婷五月天伊人| 天天久久九九| 激情五月天婷婷视频| 少妇高潮A片无套内谢麻豆传| 在线91日韩| 婷婷五月天色综合| 狠狠操狠狠爱| 这里只有精品,日韩视频| 五月婷婷黄色| 激情综合网址| www.日本91| 影音先锋偷偷色男人站| 丁香五月激情在线| 日日夜夜亚洲一区| 久久久久99精品成人片| 欧美色五月| 五月丁香拍拍激情综合| 激情六月天| 天天噜天天插| 久久a热| 激情五月丁香婷婷夜夜操| 97久久久久| 97干视频| 日韩久热| 五月丁香婷婷中文| 超碰激情网| 丁香激情久久| 日韩另类| 午夜丁香丁香婷婷| 久久久久er热| 97亚洲色 torrent magnet| 99热18| 激情五月天在线观看婷婷| 91 九色 熟女| www久久99com| 双性美人被调教到喷水A片| 婷婷欧美色| 国产AV熟妇人震精品一品二区| 亚洲成人无码网站| 国产又爽又大又黄A片| 五月开心久久| 99男人的天堂| 久久9久| 色五月婷婷中文字幕| 色九月| 天天干夜晚夜操| 婷婷亚洲五| 亚洲亚洲人成综合网络| 午夜丁香六月婷| 色婷婷五月综合| 99热这里只有精品2024| 婷婷五月丁香色色| 综合久久99| 成人在线视频一区| 日韩人妻无码精品| 六月婷婷天天操夜夜爽视频| 裸睡玩奶头(高H)| 色情播放| 婷婷五月另类网站| 婷婷六月啪啪| 超碰com| 久99热| 99热20| 字幕网AV中文字幕| 综合五月丁香六月婷婷| 色欲婷婷五月天丁香| 99男人的天堂| 日日天天天| 色色99| 五月婷婷性| 婷婷天堂视频| 操一区| 五月青青草综合| 刘玥精品一区| 强伦人妻BD在线电影| 久九色| 国产偷人爽久久久久久老妇APP| 在线五月婷婷小电影| 最近中文字幕大全免费版在线 | 开心 五月 综合| αv中文字幕在线观| 久久这里只| 五月丁香自拍| 六月婷婷激情| 激情网婷婷婷| 五月丁香综合在线| 免费看欧美成人A片无码| 另类视频丁香五月| 99人人操人人操人人精| 337p大胆噜噜噜噜噜91Av| 五月丁香激情婷婷综合字幕| 激情五月瑟瑟| 东京热伊人| 成人网站免费sxj| 久99精品视频| 第四色五月天| 欧洲第一久色| 97碰| www.色婷婷| 99热97| 99热99网| 丁香五月熟女| 九月激情网| www.minyis.com【JT】币址百万U预算可预付QQ2101460746 | 日本久久99久久| 狠狠干在线| 天天日天天日天天搞| 亚洲99在线| 无码色| 99热这里只有精品22| 久久久com| 97干在线视频精品店| 视频一二区| 精品人妻久久久| 九月婷婷激情| 五月丁香激情综合| 激情图片久久| 国产一级婬片毛片| 婷婷丁香激情综合色情| 天天碰夜夜操| 激情综合国产| 色久综合天天做视频| 五月天久久婷婷| 色欲五月丁香| 日韩亚洲视频| 天天操夜夜爽歪歪| 丁香5月激情网| 丁香五月色色婷| 九九色综合九九色| 久久六月综合| 色色综合日韩| 14色综合婷婷| 91夫妻视频| 996热re视频精品视频| 色丁香久久久| 五月丁香六月婷婷精品| 国产永久一黄| 青青草视频免费观看| 综合 夜夜| Va另类视频| 99爱爱| 亚洲精品444久久久久久| 欧美这里只有精品| 搡BBBB搡BBB搡| 色噜噜狠狠色综合网| 9国产在线视频| 第六色在线| 久久久香| 日本丰满久久| 极品少妇高潮啪啪AV无码| 99re热视频这里只精品| 丁香五月丁香伊人| 五月色在线| 婷婷丁香社区| 婷婷五月天综合亚洲| 色色婷婷五月天| 5月婷婷6月六月丁香| 丁香久久五月天视频在线观看 | 九色亚洲| 色五月天电影| 国产激情在线| 狠狠色噜噜| 久久黄色免费视频| 爆乳熟妇一区二区三区爆乳照片| 精品一二三区久久AAA片| 国产avapp 网| 99热精品在线免费观看| 91视屏在线观看com.wwwvv| 色伊人婷婷| 久操人| 伊人五月婷| 中国丰满熟女A片免费观| 在线观看亚洲视频影院| 亚洲精品大片| 五月丁香激情深爱婷婷| 色婷婷在线综合色播网| 婷婷久久五月天| 欧美日韩成人一区二区| 一级黄色操B| 五月天激情美女久久| 五月婷婷影院| 丁香五月色情| 99玖玖免费视频| 日本天天操| 99国产这里只有精品| 天天拍久久| 欧美日韩大黄| 人人草成人视频| 亚洲综合九九| 日韩操逼大片| 六月丁香婷婷色狠狠久久| 丁香五月综合激情久久潮喷| 琪琪色综合网站| 日本熟妇乱妇熟色A片蜜桃 | 欧美性生交A片免费看| 中文字幕黄色片| 日韩在线观看亚洲| 99热精品无码| 99精品小视频| 另类激情网| 五月激情丁香| 99.色| 亚洲十月婷婷综合| 人人色AV| 91视屏在线观看com.wwwvv| 九九视频这里是精品五月| www.xtbsty.cn.com蜜乳AV| 九九久久99| 九九五月天| 色五月激情| 任我鲁这里有精品视频| 色色色在线观看| 99人妻碰碰碰久久久久视| 中文字幕婷婷在线| 91热手机在线| www,超碰| 人人操人人爰人人一天天碰夜夜拍夜夜爽-中国A级毛片天天看天天谢… | 夜夜躁爽日日| 婷婷在线激情| 五月丁香偷拍| 五月天天久久香| 五月综合色| 色135综合网| 色婷另类| 狠狠色噜噜狠狠狠狠综合| 丁香五月在线自慰| 久久婷婷成人| 日本色色图| 99热免费在线| 国产精品18久久久| 99精品视频在线观看| 少妇人妻丰满做爰XXX| 人妻熟女一区二区AV| AA片在线观看视频在线播放| 国内一级片| 婷久久高清| 男人的天堂99| 久久国产高清| 久久大香蕉同僚| 久久激情综合| 五月丁香六月婷婷,婷| 色噜噜,噜噜色| 狠狠狠狠狠狠狠狠草| 久久深爱激情网| 涩婷婷五月天| 狠狠穞A片一區二區三區| 国产精品国产成人国产三级| 五月丁香无码| 色五月激情五月开心五月| 婷婷五月激情综合| 91人妻人人操| 成人资源在线| 五月丁香啪啪啪啪| 亚洲99激情| 玖玖福利视频资源| 久久九九免费视频| 色五月婷婷影院| 亚洲另类在线观看| 99热在线观看| 九月婷婷综合色干| 色情婷婷。| 激情久久久| 激情五月综合六月丁香婷婷狠狠干| 九九热亚洲中文在线观看免费| 九月丁香亭亭| 六月欧美综合色情| 丁香五月综合亚洲| 可以免费观看的AV| 99热精品在线| 乱乱av| 天啪色| 亚洲啪视频| 狠狠搞综合色| 色小说五月天| www.91.com黄| 日本熟妇乱妇熟色A片蜜桃| 五月激情综合网婷婷| 国精产品一区二区三区| www.91色| 五月花婷婷最新| 青青草成人网| 超碰免费在线| 婷婷五月天VI| 激情爱爱网站| 99这里只有免费的精品| 这里只有精品免费观看网占| 五月天久久网站| 免费看欧美成人A片无码| jiujiuxiangjiaowang| 五月婷婷激情久久| 色天天综合色| 九九精品免费| 天天天天天天操| 天天综合区| 中文字幕AV在线| www.思思99热| 少妇被下春药玩弄A片| 五月开心网| 久久色吧| 青青草原中文字幕| 99er精品视频| 久色网| 婷婷婷久久| 色情五月丁香| 99热只有这里才是精品| 久综合色| 久久九九99视频| 啊V视频在线观看| 婷婷伊人久久综合| 激情综合五月天| 操日本99| 人人爱操| 色五月激情婷婷| 九九这里都是精品| 婷婷丁香五月基地| 色五月婷婷 成人| 天天久综合| 99视频在线精品| 久久码久久无清| se色99| 开心五月天激情网| 青青青在线视频国产| 热99精品视频| 99惹精品视频| 五月婷婷激情网| 五月黄色婷婷| 99精品色色| 五月色吧| 九九成人电影婷婷| 任你草| 开心激情网五月天| 国产精品扒开腿做爽爽爽A片唱戏| 99久久喉9| 久热99| 六月婷婷色| 狠狠综合| 九九亚洲视频| 激情丁香五月天| 91狠狠综合久久久久久| 夜夜 操无码| 开心激情网在线| 少妇人妻偷人精品无码视频新浪| www超碰com| 都市激情久久| 天堂资源中文| 成人精品免费在线观看| 丁香五月天啪啪| xx人人xx| 亚洲AV影片在线观看| 99小视频| 无套内谢少妇毛片A片樱花 | 黄色av网站在线免费播放| 五月婷婷六月丁香| 五月婷婷婷丁香播| 九九婷婷五月天| 色五月开心婷婷| 亚洲第一成人无码A片| 亚洲传媒在线观看| 影音先锋女人av鲁色资源网小说免费| 美女美女美女三级色天天天天天| 国产97色在线 | 日韩| 123日本不卡在线| 天天日夜夜高潮| 综合狠狠干| 99资源在线| 色五月天视频| 777精品久无码人妻蜜桃| www999日韩精品| 五月天开心激情综合网| 2025神马午夜福利| 再綫Av免费視品| 亚洲操逼片| 久久宗合影| 伊人啪啪网| 丁香综合日产精品久久| www.sd-xiangsu.cpm| 91色婷婷综合久久中文字幕二区| 色婷婷yy久| 色综合久久天天综合网| 天天操天天操天天操天天操天天操| 99热伊人综合| 婷婷五月丁香五月天| 五月丁香在线观看| 色五月色五天色情网| 成全在线观看免费完整版第二季| 五月婷婷色色| 综合激情网五月激情| 超碰99在线观看| 91黄操| 猛烈顶弄H禁欲老师H春潮| www网站在线观看| 婷婷五月噜噜| 久久久久久久11111111111| 欧美激情Va| 99亚洲视频| 99热这里只有99| 91啪啪视频| 综合久久综合| 日韩高清成人| 婷婷少妇激情| 人妻内射一区二区在线视频| 狠狠色丁香婷婷五月| 婷婷久久亚洲| av操B网站| 日日肏天天操| 综合久久五| 五月丁香狠狠地噜噜噜噜| 天天干天天拍| 先锋资源 996| AV片一区在线观看| 99re思思热这里| 六月丁香啪啪| sewuyue第四色| www.99热| 东北婷婷五月天| 日韩AV免费电影在线播放| 亚洲无码成人性爰网| 丁香五月成人| 五月开心婷婷| 久久综合五月天激情小说网站 | 青青草原精品久久| 日韩一级| 中文字幕婷婷五月天在线观看| 国自产拍偷拍精品啪啪一区二区| 久热AA| 激情五月婷| 99色婷婷| 99亚洲视频| 激情综合网五月天天| 午夜无码熟熟妇丰满人妻| 99精品视频在线免费观看| 性做久久久久久久免费看| 婷婷五日b| 日韩二区搞逼插逼毛片| 色色色国产| 亚洲AV永久无码影院黑人| 一丁香五月天月AV| 97色97干| 成人 在线 日韩| 五月婷丁香花| 少妇伦子伦精品无吗| 天天艹天天色| 国成人网| 人人操五月天| 91精品国产99久久久久久天美| 人。妻久久| 97五月婷婷| 91婷色| 99久热这里只有精品视频删减版| 在线观看亚洲视频影院| 超碰人妻在线| 八戒青柠影视剧在线观看| 开心五月丁香综合久久| 丁香六月婷婷操逼网| 日日夜夜天天综合| 香蕉婷婷色五月| 99亚洲天堂| 成人欧美一区二区三区在线观看 | 五月激情婷婷在线| 色婷婷超碰| 伊人91| 青娱乐美女福利视频美臀| 草榴视频黄色网| 99热这里只有精品首页| 久久久久激情| 激情婷婷五月天| 五月色俺婷婷| 2015WWW永久免费观看播放| 色综合网址| 六月婷伊人| 伊人大蕉香| 99热人人| 白天AV月月| 免费操超碰| 久久网日本| 婷婷综合五月天激情| 丁香五月天日韩无码| 一本之道高清视频在线观看| 99er这里只有精品视频| 婷婷综合婷婷| 五月天激情网图片| 丁香五月天导航| 九九九九九999999| 激情综合一| 天天婷婷综合| 亚洲av综合在线| 天堂中文最新版| 色VA| 一区二区你懂的| 欧美日韩成人免费在线| 南京搡BBBB搡BBBB| 亚洲av无码影院| 久久综合九九| 婷婷五月天首页| 欧美日韩国产一区| 久久小说| 综合成人小说婷婷| 激情另类综合| 久久久久久久久久久久久久久久久精典| 电影爱拉战争免费观看| 殴美97色| 丁香六月婷婷开心| 思思热再线视频| 97色啪| 亚州美女| 思思热在线| 天天成人综合| av第一二区| 亚洲愉拍99热成人精品 | 久久婷婷五月综合啪| 国产在这里只有精品| 夜夜爽天操| 120分钟婬片免费看| 亚洲黄色操逼| 综合色播| 婷婷五月激情在线视频| 久久久久久欧美精品se一二三四| 婷婷五月天激情网| 欧美婷婷五月天| 亚州激情在线视频| 激情五月综合第一页| 日本强伦片中文字幕免费看| 99热这里只有精品在线| 五月丁香拍拍激情综合| 成人在线网站| 激情五月综合网| 91婷婷丁香五月| 五月丁香激情婷婷综合| 97在线视频观看| 婷婷丁香先锋资源网站| 禁欲电影完整版在线播放| 婷婷五月天av| 色五月五月丁香| 久操大香蕉| 婷婷性爱综合| 国产肥白大熟妇BBBB视频| 久久婷狠狠色| 洗浴中心操B视频| 国产噜一噜天天噜| 91艹人| 五月天丁香久久综合 | 色婷婷影| 色婷婷99| 亚洲成人影视在线观看| 亚洲成人人人操| 天天爽成人综合网站| 丁香五月婷婷Av| 美女久久婷婷| 激情五月天电影| 色就干| 狠狠操狠狠做| 欧洲亚洲免费视频9| 婷婷五月天综合久久| 亚洲一二三网| 五月丁香五月婷婷| 操日视频| 色五月婷婷激情| 伊人丁香五月| 丁香啪啪| 婷婷九色| 国av网| 亚洲亚洲人成综合网络| 8区视频在线| 高清无码视频网址| 五月天成人在线| 色波激情五月天| 999激情视频| 99丝袜精品视频网站| 超碰成人公开| 久久精彩免费视频| 五月丁香啪啪综合| 激情小说在线视频| 99色最新在线视频网站| 插插干干干色| 九九日本视频| 国产精品99久久久久久猫咪| 亚洲欧洲一二| 青青久久五月| 强壮公让我夜夜高潮A片视频| 五月天亭亭俺也| 五月婷深深爱激情网| Av狠狠色丁香婷| 色婷婷操逼| 人人操人人爰人人一天天碰夜夜拍夜夜爽-中国A级毛片天天看天天谢… | 久久久噜噜噜久久人妻| 亚洲激情精品| 五月婷无码| 五月天婷婷三级黄| 久99| aa久久| 久久婷婷五月天激情四射| 亚洲色五月婷婷| 91在线人| 国产毛片操B| 99热在线观看| 99久久人妻精品无码二区| 五月丁香香蕉| 久久精典| 999激情视频| 中文在线最新版天堂8| 亚洲热视频在线| 色丁香五月天婷婷| 五月婷婷福利| 婷婷伊人久久综合| 伊人婷婷色激情丁香| 天天日夜夜夜操操操操| 婷婷大美在线| 热久久成人| 欧美婷婷六月丁香综合色连续高潮抽搐| 热久91| 亚洲欧洲美女在线观| 大香蕉综合视频在线| 欧美性生交A片免费看| 99热这里是精品| 色五月激情五月天| 婷婷五月丁香五月| 婷婷基地爱| 亚洲另类在线观看| 欧美99| 欧洲亚洲精品| 婷婷五月天视频| 天天日日夜夜| JAPANRCEP老熟妇乱子伦视频| 91se在线视频| 91日本在线观看| 欧美内射AA|